The To-Do List

Here are a list of things that need to be done on the house, broken down by room. Things that have been sitting, waiting to be finished, mocking me on a daily basis. Ugh.

Living Room
1. Install trim around window
2. Crown molding
3. Fill nail holes and paint trim
4. Hang curtains (once Fiona is old enough not to climb them)
5. Finish spray-painting fireplace doors and re-install
6. Figure out what to do around the fireplace (tile? mantle surround?) and then do it
7. Fix door handle on closet
8. Organize closet (DVD's, CD's, books)
9. Figure out something to do about brick hearth (paint? resurface?)
10. Replace entry door (preferably something with blinds or curtains)

Master Bathroom
1. Sand walls and re-paint for a smooth finish
2. Install shower head and faucet
3. Seal grout in the shower
4. Install hardware (towel bars, toilet paper dispenser, etc)
5. Figure out some storage
6. Re-paint and hang door
7. Chair rail
8. Crown molding and baseboards
9. Fill nail holes and paint trim

Master Bedroom
1. Install last piece of crown molding
2. Replace window apron
3. Fill nail holes and paint trim
4. Hang curtains (again, once Fiona is older)
5. Install lighting in the closet
6. Fix bedroom door so it opens/closes quietly

Guest Room/Craft Room/Office
1. Touch-up paint
2. Baseboards
3. Replace window apron
4. Fill nail holes and paint trim
5. Hang curtains
6. Install closet rods and shelves
7. Hang closet doors

Dining Room
1. Install beadboard and chair rail
2. Crown molding and baseboards
3. Replace window apron
4. Fill nail holes and paint trim
5. Find and install a pretty chandelier

Entry Way
1. Finish installing trim
2. Touch-up paint around door
3. Crown molding
4. Install picture ledge
5. Fill nail holes and paint trim
6. Find and install a pretty light fixture
7. Install a new entry door (preferably something with windows)

Everywhere upstairs:
1. Fill nail holes in hardwood floor
2. Transitions wherever hardwood meets ceramic tile
3. Install quarter-round where the hearth meets the hardwood

The kitchen and main bathroom upstairs are on hold until the other small projects are finished, because those are going to be MAJOR overhauls. And this is just the upstairs, people!

While we have accomplished quite a bit in the past few months, there is still a loooooong way to go. *sigh*

Comments

Popular posts from this blog

Trimming Cabinets

Trim, trim, and more trim

Spring Cleaning